The project involved removal of existing seating, railings, casework, flooring and ceiling finishes. Plumbing rough in at the restroom, demolition on the lower level and corridors. Above ceiling fire protection, electrical and mechanical, drywall and acoustical finishes were performed. Light fixtures, mechanical diffusers, grills and sprinkler system trim out were also completed. The building was turned over to the owner August 1, 2014.