Blog Archives
Georgia DNR Wildlife Resources Building
Written on August 23, 2016 at 3:51 PM, by Chandler Burckbuchler
KPC built a new Wildlife Resources Building for the Georgia Department of Natural Resources in Social Circle, GA. This building was new construction and the project was completed within 8 months. Work consisted of the addition of an 11,500 SF wood frame building and demo and renovation of existing offices.
Heyward Allen Toyota
Written on September 30, 2015 at 4:30 PM, by SEOteric
The 17,000-square-foot facility major renovation included a new climate controlled, four-stall vehicle delivery bay, children’s play area, three guest lounges, a café, office and reception areas, and modifications to plumbing, electrical and HVAC. The project was performed on the active site as the business was open. Various stages of construction were used to minimize the Continue Reading »
UGA Chemistry Auditorium
Written on September 30, 2015 at 4:20 PM, by SEOteric
The project involved removal of existing seating, railings, casework, flooring and ceiling finishes. Seating, railing, casework, chalkboards, acoustical wall panels etc. were removed first. Scaffolding was installed to remove the existing ceiling. Plumbing rough in at the restroom, demolition on the lower level & corridors were concurrent with the upper level. Above ceiling fire protection, Continue Reading »
Shoppes at Lake Oconee
Written on September 23, 2015 at 3:36 AM, by SEOteric
A 18,375 SF shopping center in Lake Oconee Village near Reynolds Plantation in Greene County. Suite sizes range from 1,220-2,695 SF. Current National Tenants include Verizon Wireless and Benjamin Moore Paint. For information about lease space available in this center, please contact us.
Rocky Plains Elementary School
Written on September 23, 2015 at 3:07 AM, by SEOteric
Kevin Price Construction completed construction of a 85,000 SF new elementary school with a 20,000 SF detached gym on a 26 acre site in Covington, GA. Work consisted of sitework and erecting the two new buildings complete with offices, classrooms, a cafeteria, a media center, and computer labs. In spite of challenges that arose as Continue Reading »
Morgan County High School Gymnasium
Written on September 23, 2015 at 2:37 AM, by SEOteric
The Morgan County High School Gymnasium was a 39,318 square foot new building in the center of an existing, operating campus. The building is a 2 story state-of-the-art gymnasium facility with elevated walkways to tie in to existing grandstands. The gymnasium incorporated an elevator, wood sports floor, showers and locker rooms and full concession areas. Our Continue Reading »