Shoppes at Lake Oconee
Written on September 23, 2015 at 3:36 AM, by SEOteric
A 18,375 SF shopping center in Lake Oconee Village near Reynolds Plantation in Greene County. Suite sizes range from 1,220-2,695 SF. Current National Tenants include Verizon Wireless and Benjamin Moore Paint. For information about lease space available in this center, please contact us.
Eastside High School
Written on September 23, 2015 at 3:21 AM, by SEOteric
Kevin Price Construction completed a 20,000 SF addition involving the creation of new classrooms to Eastside High School in Covington, GA.
Conyers Middle School
Written on October 27, 2016 at 4:40 PM, by Chandler Burckbuchler
135,023 SF of alterations and additions to a 37 year old building in Conyers, GA. New additions included a Career Center and kitchen. Scope of work included sitework, classroom additions, concrete slabs on grade, casework, and built up roofing. Electrical upgrades were made to the entire building and HVAC was replaced. Method of Delivery: Continue Reading »
Morgan County High School Cafeteria
Written on September 23, 2015 at 3:20 AM, by SEOteric
This project for Morgan County High School involved new construction of a 3,000 SF cafeteria in Madison, GA.
Rocky Plains Elementary School
Written on September 23, 2015 at 3:07 AM, by SEOteric
Kevin Price Construction completed construction of a 85,000 SF new elementary school with a 20,000 SF detached gym on a 26 acre site in Covington, GA. Work consisted of sitework and erecting the two new buildings complete with offices, classrooms, a cafeteria, a media center, and computer labs. In spite of challenges that arose as Continue Reading »
Crossroads Baptist Church
Written on September 23, 2015 at 3:04 AM, by SEOteric
Kevin Price Construction provided construction services as GC/CM at Risk to Crossroads Baptist Church for the building of their new 14,000 SF church in Covington, GA. Scope of work included earthwork, installation of a septic system, masonry, ceiling and painting & finishes. Hiring contractors to paint a church holds significant importance, not only for aesthetic Continue Reading »
First United Methodist Church
Written on September 23, 2015 at 3:03 AM, by SEOteric
KPC served as CM at Risk in constructing 2 projects for Madison FUMC. The first project was a new 17,000 SF Fellowship building in the heart of the Madison Historic District. The City of Madison Historic Design Commission approval and supervision was required throughout the project. Due to site considerations and historic aspects, challenges were Continue Reading »
Abbey Hospice
Written on September 23, 2015 at 2:59 AM, by SEOteric
13,000 SF Design-Build CM at risk project. This is a state of the art hospice/medical facility with high end finishes and multi-room residential quarters. KPC was able to value engineer during pre-construction in order to reach the owner’s budget.