Blog Archives

Morgan County Public Safety Complex

Written on May 27, 2016 at 11:10 AM, by

A 186,00 SF Design/Build CM at Risk project involving the renovation of the Morgan County Public Safety Complex in Madison, GA. This project required KPC to convert an existing building that consisted primarily of warehouse space into Fire and EMS Headquarters.

Lawrenceville City Hall

Written on October 5, 2015 at 7:49 PM, by

62,304 SF interior renovation of 4 story city hall building, including mechanical, elevator. This project was a multi-phase, owner occupied remodel.  Work consisted of new and renovation sections of a 15 year old building.  The 4th floor was a total buildout for the Mayor’s office and staff and a public meeting room with studio lighting.   Continue Reading »

ACC Diversion Center

Written on September 23, 2015 at 2:56 AM, by

KPC served as the general contractor in the construction of a new, 13,500 SF medium security dormitory facility for Athens-Clarke County. This facility was built to house non-violent inmates sentenced to a work release program. The steel, masonry, and EIFS facility includes dormitory space, restrooms, laundry, vending & food service areas. This project achieved LEED certification  Continue Reading »

Mingledorff’s Opelika

Written on June 2, 2017 at 11:17 AM, by

A design-build project involving the construction of a  1 story, 26,000 SF industrial warehouse complete with offices, a showroom, and a training room. This is the second project Kevin Price Construction has completed with Mingledorff’s.

North Oconee High School Fieldhouse

Written on September 23, 2015 at 2:35 AM, by

KPC has completed numerous projects for Oconee County Schools, including this new field house at North Oconee High School. This project involved the creation of a 2-story 13,000 SF Fieldhouse with concession facilities for North Oconee High School. KPC was selected as the low bidder and the project was still initially over the owner’s budget;  Continue Reading »

Georgia DNR Wildlife Resources Building

Written on August 23, 2016 at 3:51 PM, by

KPC built a new Wildlife Resources Building for the Georgia Department of Natural Resources in Social Circle, GA. This building was new construction and the project was completed within 8 months. Work consisted of the addition of an 11,500 SF wood frame building and demo and renovation of existing offices.

Shoal Creek Elementary

Written on May 27, 2016 at 10:43 AM, by

This project consisted of a 10,000 SF renovation and addition project to Shoal Creek Elementary School in Conyers, GA. Scope of work included an 8 classroom addition, ceiling replacement, HVAC upgrades, and site work.  

Best Friend Park Gym Renovation

Written on December 16, 2015 at 9:33 PM, by

KPC recently completed a renovation of the oldest gymnasium in the Gwinnett County Park System.  Best Friend Park was built in the 1970’s and has provided recreational opportunities to the Norcross area for decades.  Our Scope of Work includes: roof replacement, new athletic wood flooring, demolition and reconstruction of the office area, addition of an elevator,  Continue Reading »

Kennedy Elementary School

Written on September 19, 2016 at 11:31 AM, by

KPC completed a 58,505 SF renovation project at Kennedy Elementary School in Winder, GA. This facility was a one-story steel framed structure with masonry walls. Scope of work for this project included demo and replacement of ceilings, lighting, electrical, mechanical, and roof.  All work had to be completed during the summer break in order for  Continue Reading »

Heyward Allen Toyota

Written on September 30, 2015 at 4:30 PM, by

The 17,000-square-foot facility major renovation included a new climate controlled, four-stall vehicle delivery bay, children’s play area, three guest lounges, a café, office and reception areas, and modifications to plumbing, electrical and HVAC. The project was performed on the active site as the business was open. Various stages of construction were used to minimize the  Continue Reading »

« Older Entries

Newer Entries »

“Our firm has worked with KPGC on various types of buildings throughout Northeast Georgia.  In that time, we have found few other contractors that possess the consistency, integrity and attention to detail as KPGC.”

Ben M. Carter Architect Carter Watkins Associates Architects, Inc. September 22, 2015

"The quality of work is outstanding and the on-time completion was admirable considering the many obstacles that were encountered.”

Michael Alden Project Manager/Assistant Director – Construction Dept. University of Georgia September 22, 2015

“Your company’s ability to meet the challenges of this complex job is a testament to your determination and quality driven mission... They are professional, focused and display good integrity.  You can count on what they tell you.”

Bob Monk Director of Operations & Maintenance PROJECT: Morgan County Board of Education September 18, 2015

“KPGC communicated extremely well with the owner, subcontractors, inspectors and school system employees to insure that project goals and timelines were met.”

Joe Perno Assistant Superintendent for School Operations PROJECT: Barrow County School System September 18, 2015

"Oconee County Schools is extremely pleased with the quality of the construction we received and the level of cooperation we experienced from day one of the project.”

Jake Grant Chief Operations Officer Project: Oconee County Schools September 22, 2015

<< Prev
Next >>

Go to References

Contact Us

Please fill out all the fields in the form below and we’ll get in touch with you ASAP!

  • This field is for validation purposes and should be left unchanged.